News
Activity News Digest on September 4-10

Activity News Digest on September 4-10


Two wells at Istiqlol are connected to electrochemical protection facilities


On 30 August 2023, ERIELL Group specialists completed the works on connection of wells #1 and #2 of Istiklol field of Mubarek oil and gas production department of Kashkadarya region to electrochemical protection facilities.

ERIELL Group acts as a general contractor of the project "Programme of Measures to Increase Hydrocarbon Production", which is implemented jointly with "Uzbekneftegaz" JSC, in terms of construction of oil and gas facilities.

ERIELL Group: meeting on the results of activity for August


On 5 September, a meeting was held to review the results of ERIELL "Central Asia" for August.

The event was held in online format. The heads of the head office in Tashkent, as well as of Karshi, Ustyurt, Fergana and Surkhandarya offices reported on the work done in August, reviewed the topics on the agenda, discussed the issues that arose and ways to solve them.

The Project Management Department presented a report on the volumes of works performed. Information on regional expeditions was heard.

The following issues were considered: performance indicators of the 6+6 Production Programme for 2023; implementation of the protocol order of the previous meeting; HSE status; provision of light motor vehicles and plugging equipment; conduct of works and organisation of production on derrick installation works, as well as with coiled tubing unit in drilling and well workover operations, report on construction of oil and gas facilities.

At the meeting the record figures for commercial speed (1833 m/st.m) and penetration per day (876 m per day) were also announced.

All questions, suggestions and conclusions were reflected in the final protocol.